EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
ToddsCH650B
-
Listing for Category : firewall
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (92)
Elevator
- (8)
-
Final Assembly
-
AlumiPrep and Alodine
-
Breakdown and Cleaning
-
Installed L's
-
Corrected Mistake
-
Fitting Parts
-
Started Horn
-
Started Assembly
Engine
- (4)
-
Corvair Teardown
-
Corvair Teardown
-
Corvair Teardown
-
Corvair Teardown
Firewall
- (6)
-
Completed
-
Started
-
Assembly
-
Assembly
-
Assembly
-
Started
CabinFloor
- (6)
-
Reassemble
-
Disassemble, Debur,...
-
Final Hole Drilling
-
Rudder Pedals
-
Started
-
Started
H-Stabilizer
- (10)
-
Riveted Top Skin
-
Rivet Top Skin
-
Assembly
-
Priming
-
Deburring and Cleanup
-
Final Drilling
-
Fitting and Drilling...
-
Hinge Fitting
-
Skin fitting
-
Skeleton Assembly
LeftAileron
- (4)
-
Final Assembly
-
Drilling and Priming
-
Assembly
-
Started
LeftWingFlap
- (3)
-
Final Assembly
-
Pilot Drilled and...
-
Pilot Drilled Ribs...
LtRrFuseSide
- (6)
-
Reassemble
-
Disassemble, Debur,...
-
Final Hole Drilling
-
Longerons
-
L's
-
L's
RearFuselage
- (11)
-
Priming
-
Reassemble
-
Disassembly
-
L's
-
Main Gear Channel
-
Fairleads
-
Rudder Cable Fairings
-
Reassemble
-
Longerons
-
Corrected Mistake
-
Started
RearLowrFuse
- (13)
-
Corrected Mistake
-
Corrected Mistake
-
Priming
-
Corrected Mistake
-
Final Assembly
-
Disassembly
-
Final Hole Drilling
-
Z's
-
Lower Rudder Hinge
-
Longerons
-
Z's
-
Assembly
-
Started
RghtWingFlap
- (4)
-
Final Assembly
-
Priming
-
Assembly
-
Drill Ribs
RightAileron
- (3)
-
Completed
-
Assembly
-
Started
RtRrFuseSide
- (6)
-
Final Assembly
-
Drilling
-
Panel Positioning
-
Drilling
-
L's
-
Started
Rudder
- (7)
-
Completed
-
Corrected Mistake
-
Corrosion Protection...
-
Deburring
-
Started nose skin
-
Assembly
-
Tail kit inventory...
None
- (1)
-
Kit Sold
Builder Name:
Todd Osborne
-
Project:
Zenair - CH 650 B
-
VIEW REPORTS
Total Hours:
231
Start/Last Date:
Nov 18, 2017 - Dec 20, 2020
Engine:
Corvair
Propeller:
TBD
Panel:
GlassPack (Custom)
Friendly URL:
https://eaabuilderslog.org?s=ToddsCH650B
Home or Last Project Picture
Jan 18, 2019
Completed
- (3 hours)
Category: Firewall
Install lower section, including sliders, replaced upper doubler, sprayed Nason primer, reassembled, riveted, and bolted bearing
0001.jpg
0002.jpg
0003.jpg
Jan 17, 2019
Started
- (2 hours)
Category: Firewall
Countersinking holes for firewall lower support, hand riveting parts that could not be done with pneumatic riveter, trimming sliders
Jan 04, 2019
Assembly
- (3 hours)
Category: Firewall
Assembly and riveting. Need to order hand riveter to get into tight spots, and still waiting for replacement doubler.
0001.jpg
0002.jpg
0003.jpg
0004.jpg
0005.jpg
Jan 03, 2019
Assembly
- (4 hours)
Category: Firewall
Final drilling and fitting and sticker removal. Deburring components, all but firewall steel itself. AlumiPrep and Alodine. Spray Zinc Phosphate. Deburring main firewall metal.
0001.jpg
0002.jpg
Jan 02, 2019
Assembly
- (3 hours)
Category: Firewall
Drilled and fit back stiffeners. Drilled and fit center stiffeners, disassembled. Almost ready for deburring and corrosion protection.
0001.jpg
0002.jpg
Jan 01, 2019
Started
- (4 hours)
Category: Firewall
Started drilling bottom and top stiffeners. Top stiffener and doubler. Completed drilling of side stiffeners.
0002.jpg
0003.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.